Lead Time Master

This table shows the assigned lead time (in days) for each department by part number. This is critical for the backward scheduling logic.

Part NumberDescriptionInventoryFabricationProofLoadSandblast and PaintPre AssemblyFinal AssemblyFinal Quality InspectionReady to ShipTotal Lead Time
AGSE-C150-G01CF34-8E FAN ROTOR CONTAINER46 days
AGSE-T016-G08PEDESTAL SET, V2500-A1/A534 days
956A8600G04ENGINE STAND, LEAP-1B65 days