This table shows the assigned lead time (in days) for each department by part number. This is critical for the backward scheduling logic.
| Part Number | Description | Inventory | Fabrication | ProofLoad | Sandblast and Paint | Pre Assembly | Final Assembly | Final Quality Inspection | Ready to Ship | Total Lead Time |
|---|---|---|---|---|---|---|---|---|---|---|
| AGSE-C150-G01 | CF34-8E FAN ROTOR CONTAINER | 46 days | ||||||||
| AGSE-T016-G08 | PEDESTAL SET, V2500-A1/A5 | 34 days | ||||||||
| 956A8600G04 | ENGINE STAND, LEAP-1B | 65 days |